due to technical reasons 02/10/2012
we have been try to update the blog and have not been very succesful ,all working fine now thanks to the very nice bt lady so update for cats whiskers bowthruster fitted shower room 90% complete .multi fuel stove fitted to the new bs standard i,ll blog the instalation of that anotherday,mick has started prepping the floor for the amtico flooring and ive made and fitted the cratch board ready for mondays template to be made.A visit to xr&d to see nb chyndor taking shape and finally a big welcome to nb Linton Lass a 57 semi -trad we will be building for the owners robert and gill .photos to follow when we start building Add Comment happy new year 01/13/2012
trimming and varnishing to galley and saloon ,beta engine has been commisioned also led spotlights have been fitted and a new workshop stove! and finally good luck to paul and cait who can start their boating adventures after narrowboat yr ddraig camlas has had her extensive refit,i,ll post some interior shots soon worktops,window trims & nb Chyandour!!!! 12/16/2011
the oak worktops are fitted the underneaths have been oiled along with the cutouts ufortunatley ran out of time to do the topsides .Its great to see things finally start coming together .The window trims have been made and fitted and have had 1 coat of satin varnish ,Monday was a great day and i would like to welcome nb Chyandour to the Kingfisher stable a 57ft trad with a beta 38 trad layout.The base plate has been laid today at xr&d and will be with us middle of march .our next bespoke build slot is now september 2012 the layout of chyandour galley and shower room update 12/09/2011
works going well and on schedule templates for the oak worktops have we have fitted the new thetford cassette toilet it has a ceramic bowl also the showe tray has been fitted along with the waste pump Post Title. 12/02/2011
This is your new blog post. Click here and start typing, or drag in elements from the top bar. plumbing and more plumbing 12/02/2011
started work on the plumbing this week we have made a recess in the bottom of the side sheets ,this will help us to hide the pipe work without having a huge pipe boxing ,it should look like a normal skirting when ive fitted them.Also the water pump and accumalater have been fitted ,on monday we can pressure test the pipework and then fill it .Ive also started thegalley and i can start work on the curved oak breakfast bar later next week led lights and alde boiler 11/25/2011
micks been busy installing the led lights each one uses only 3.5 watts and will supplement the led spots which we will install later,bulkheads have all gone up ,they form the bedroom ,shower room and also the oven and boiler housing next week radiators and 1st fix plumbing face book 11/18/2011
you can now join us on face book .this is where you will see the news and special offers first a few late nights 11/18/2011
work is going well and after a couple of days of working overtime its all coming together well a few uptodate photos showing lining to the sides completed and painted ,water tank fitted and filled and ive started on the bulkheads and the electric cupboard next friday all the bulkheads and shower room The cats whiskers 11/14/2011
we started the cats whiskers in october ,shes a 60ft semi trad full bespoke fit out completion march 31st 2012 (guarenteed) Pat & Roger will eventually live aboard so she will have all the comforts of home ,Fitted out in American white oak with painted ceiling and cabin sides all trimmed in a contempory shaker style the next few photos will show our progress to date and regular up dates will follow | Kingfisher narrowboatsupdated blog for customers new build boats and general canal related items !!. ArchivesJanuary 2012 Categories |