due to technical reasons 02/10/2012
0 Comments
 
we have been try to update the blog and have not been very succesful ,all working fine now thanks to the very nice bt lady
so update for cats whiskers bowthruster fitted shower room 90% complete .multi fuel stove fitted to the new bs standard i,ll blog the instalation of that anotherday,mick has started prepping the floor for the amtico flooring and ive made and fitted the cratch board ready for mondays template to be made.A visit to xr&d to see nb chyndor taking shape  and finally a big welcome  to nb Linton Lass  a 57 semi -trad we will be building for the owners robert and gill .photos to follow when we start building
Picture
Picture
Picture
Add Comment
 
happy new year 01/13/2012
0 Comments
 
trimming and varnishing to galley and saloon ,beta engine has been commisioned also led spotlights have been fitted and a new workshop stove! and finally
good luck to paul and cait who can start their boating adventures after narrowboat  yr ddraig camlas has had her extensive refit,i,ll post some interior shots soon
Picture
Picture
Picture
Picture
Add Comment
 
worktops,window trims & nb Chyandour!!!! 12/16/2011
5 Comments
 
the oak worktops are fitted the underneaths have been oiled along with the cutouts ufortunatley ran out of time to do the topsides .Its great to see things finally start coming together .The window trims have been made and fitted and have had 1 coat of satin  varnish ,Monday was a great day and i would like to welcome nb Chyandour to the Kingfisher stable a 57ft trad
with a beta 38 trad layout.The base plate has been laid today at xr&d and will be with us middle of march .our next bespoke build slot is now september 2012
Picture
Picture
Picture
Picture
Picture
the layout of chyandour
5 Comments
 
galley and shower room update 12/09/2011
0 Comments
 
works going well and on schedule templates for the oak worktops have
we have fitted the new thetford cassette toilet it has a ceramic bowl also the showe tray has been fitted along with the waste pump
Picture
Picture
Picture
Add Comment
 
Post Title. 12/02/2011
0 Comments
 
This is your new blog post. Click here and start typing, or drag in elements from the top bar.
Add Comment
 
plumbing and more plumbing 12/02/2011
0 Comments
 
started work on the plumbing this week we have made a recess in the bottom of the side sheets ,this will help us to hide the pipe work without having a huge pipe boxing ,it should look like a normal skirting when ive fitted them.Also the water pump and accumalater have been fitted ,on monday we can pressure test the pipework and then fill it .Ive also started thegalley and i can start work on the curved oak breakfast bar later next week
Picture
Picture
Picture
Picture
Add Comment
 
led lights and alde boiler 11/25/2011
0 Comments
 
Picture
micks been busy installing the led lights each one uses only 3.5 watts and will supplement the led spots which we will install later,bulkheads have all gone up ,they form the bedroom ,shower room and also the oven and boiler housing next week radiators and 1st fix plumbing
Picture
Picture
Picture
Add Comment
 
face book 11/18/2011
0 Comments
 
you can now join us on face book  .this is where you will see the news and special offers first
Add Comment
 
a few late nights 11/18/2011
0 Comments
 
work is going well and after a couple of days of working overtime its all coming together well a few uptodate photos showing lining to the sides completed and painted ,water tank fitted and filled and ive started on the bulkheads and the electric cupboard  next friday all the bulkheads and shower room
Picture
Picture
Picture
Add Comment
 
The cats whiskers 11/14/2011
0 Comments
 
we started the cats whiskers in october ,shes a 60ft semi trad full bespoke fit out completion march 31st 2012 (guarenteed)
Pat & Roger  will eventually live aboard so she will have all the comforts of home ,Fitted out in American white oak with painted ceiling and cabin sides all trimmed in a contempory shaker style the next few photos will show our progress to date and regular up dates will follow
Picture
Picture
Picture
Picture
Picture
Picture
Add Comment
 
<< Previous

    Kingfisher narrowboats

    updated blog for customers new build boats and general canal related items !!.

    Archives

    January 2012
    December 2011
    November 2011
    May 2011
    March 2011
    January 2011
    December 2010
    November 2010

    Categories

    All
    Kingfisher Narrowboats
    Trent Class 57

    RSS Feed